NC State Park Dam EAPs
The scope of services included obtaining the most recent information from the North Carolina Floodplain Management Program (NCFMP) for local tributaries; collecting data via NCFMP LiDAR contours, aerials, and other pertinent information; and field verifying existing conditions of each dam and downstream structures. We calculated hydrology such as drainage area and discharges using the United States Geological Survey StreamStats tool. We developed a hydraulic model using the data obtained from NC Division of Parks and Recreation, Dam Safety, and HEC-RAS models for developing FEMA flood elevations and created georeferenced floodplain boundaries to show the inundation extents. Ω
Overview
- Client:
North Carolina State Parks - Location:
Various locations throughout NC - Contact:
Erin Lawrence, PE
NC Division of Parks and Recreation
919-733-4181 - Start/completion:
6/2015 – 12/2015 - Project manager:
Ted Bartelt, PE
Experience
- EAP
- Flood study
- Hydraulic model
