Jacksonville EAPS
EAPs for LTS South Storage Lagoons and Elizabeth Lake Dam
The scope of services included the removal of Elizabeth Lake from NCDEQ’s dam registry. The dam was breached a few years ago from a storm, draining the lake. A&O developed hydraulic models in HEC-RAS as supporting evidence and prepared paperwork to assist the City of Jacksonville with removing this structure from the dam registry. The EAP was updated in 2023.
Overhead
- Client:
City of Jacksonville - Location:
Jacksonville, NC - Contact:
Brandon Davis
Plant Operator
910-938-5322 - Project Cost:
$32,000 - Start/completion:
2/2015 – 8/2015 | 7/2023 (Update) - Project Manager:
Ted Bartelt, PE
Experience
- Emergency action plan
- Flood study
- Dam removal
- Hydraulic modeling