Crabtree Creek Trail Boardwalk
Structure 104 Feasibility Study and Repair
A&O inspected the structure to determine its condition and capacity. Inspection work included hammer sounding, field measurements of the emergency repairs, documenting damage, and identifying critical areas in need of repair. After the inspection, A&O analyzed the structure, designed permanent repairs, and developed cost estimates and project specifications. Repairs included retrofitting existing helical anchors, replacement of damaged bent caps, and replacing diagonal bracing with chain restraints.
The A&O team provided construction administration services for this project after design was complete. Ω
Overview
- Client:
City of Raleigh Parks, - Location:
Raleigh, NC - Contact:
Lisa Schiffbauer
Senior Greenway Planner
Raleigh Parks, Rec, and Cultural Resources
919-996-4786 - Design fee:
$9,350 - Construction cost:
$145,045 - Start / completion:
12/2016 –
1/2017 (construction documents)
2/2018 (construction) - Project manager:
Forrest Robbins
Experience
- Visual inspection
- Structural analysis
- Boardwalk repair design
- Engineer's opinion of probable construction cost