Mayo River State Park
Roadway Improvements
A&O’s scope for this portion of the project included the redesign of Old Mayo Park Road and designs for two new parking lots.
Highlights included:
Realigning the entrance of the park to intersect US 220 Business at 90 degrees.
Redesign of the existing 3,600-foot corridor to accommodate two 12-foot travel lanes with six-foot grass shoulders.
Design of secondary roads to access a new 40-car parking lot for the existing picnic shelter.
Design of secondary roads to access a new 20-car parking lot and access for the proposed contact station and workshop.
Design of approximately 900 feet of ADA-compliant sidewalk for site connectivity.
Overview
- Client:
NCDENR Division of Parks and Recreation - Location:
Mayodan, NC - Prime consultant:
HagerSmith Design - Contact:
Bryan Gibson, AIA
HagarSmith Design, PA
919-838-5122 - Construction cost:
$1.7 M - Start/completion:
6/2006 – 5/2010 - Project manager:
Glenn Zeblo, PE
A&O’s complete project responsibilities included preparation of construction plans; stormwater drainage design; erosion and sediment control design; grading; staking; utility design; structural assessment for historic renovation; repair recommendations, and structural design tasks. Ω

