Fort Gordon Back Hall
Structural Design for Concrete Piers and Pads
A&O conducted a field investigation to determine the size and spacing of the existing structural framing and analysis of existing elements. We coordinated with Eaton Corporation to determine if any conflicts exist regarding size, weight, and location of equipment, and analyzed existing supports and slab-on-grade for equipment loading. We designed and developed construction documents for new slab-on-grade and concrete support piers and pads for the equipment. We developed as-built drawings to include any field modifications during construction. Ω
Overview
- Client:
US Army Garrison Fort Gordon - Location:
Augusta, GA - Prime Consultant:
Eaton Corporation - Contact:
Ben Tran, PE, RCDD, LEED AP
Eaton Corporation
Senior Project Manager
919-870-3489 - Design fee:
$21,201 - Start/completion:
3/2016 – 9/2017 - Project manager:
Ted Bartelt, PE
Experience
- Concrete pad and pier design
- Structural analysis
- Construction documents